| Brand Name: | Peterack |
| Model Number: | PT-SPR-4000 |
| MOQ: | 1 x 40HQ Container (approx. 25 tons) |
| Price: | USD 0.88 - 1.20 / Kilogram |
| Payment Terms: | T/T,L/C at sight |
| Supply Ability: | 1800 Tons per Month |
Our selective pallet racking system gives 100 percent direct access to every pallet position, which is why it remains the default choice for distribution warehouses that run a mixed SKU profile. This configuration is rated at 4,000 kg per level on W80 to W120 roll-formed uprights, and ships with galvanized wire mesh decking so the rack is ready to load on the day it is anchored.
![]()
![]()
![]()
![]()
![]()
| Item | Specification |
|---|---|
| Upright profile | W80 x D60, W90 x D68, W100 x D68, W100 x D95 |
| Upright thickness | 1.8 - 3.0 mm high strength steel |
| Load capacity | 4000 kg per level, up to 21,000 kg per upright pair |
| Frame height | 2,000 - 12,000 mm |
| Frame depth | 800 - 1,200 mm |
| Beam length | 1,500 - 3,300 mm |
| Beam adjustment | 50 mm pitch, boltless safety lock |
| Decking | Galvanized wire mesh deck, 50 x 100 mm mesh |
| Finish | Powder coated or hot dip galvanized |
| Colour | RAL 5015 blue, RAL 2004 orange, RAL 7035 grey, custom on request |
![]()
![]()
![]()
![]()
![]()
![]()
Uprights are roll formed from high strength galvanized or cold rolled coil, then powder coated at 200 C. Each production batch is dimensionally checked, weld inspected and load tested to 1.5 times the rated capacity. Racking is designed to FEM and EN 15512 principles, and CE marking plus ISO 9001:2015 certificates are supplied with every shipment. SGS, BV or TUV inspection can be arranged before loading.
Frames, beams and decking ship as nested steel bundles with cardboard corner protectors and stretch film, at approximately 25 tons per 40HQ container. We quote FOB Shanghai or Ningbo, CIF and DDP. Installation supervision, layout drawings and a spare parts kit can be included in the offer.
Share your pallet dimensions, load weight, racking height and warehouse drawing. Our engineering team will return a bay-by-bay selective pallet racking layout, a bill of materials and a delivered price within two working days.