logo

products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Radio Shuttle Rack
Created with Pixso.

Cold Warehouse Radio Shuttle Racking System 1500kg Pallet Load High Density Storage Solution

Cold Warehouse Radio Shuttle Racking System 1500kg Pallet Load High Density Storage Solution

Brand Name: Peterack
Model Number: PTR-RS1500
MOQ: 1 Set
Price: USD 1800-3500 / Set
Payment Terms: T/T,L/C,Western Union
Supply Ability: 500 Sets per Month
Detail Information
Place of Origin:
Jiangsu, China
Certification:
ISO 9001:2015
System Type:
Radio Shuttle Pallet Racking
Load Capacity:
1000-1500 Kg Per Pallet, Up To 2000 Kg On Request
Load Per Level:
2000-4000 Kg
Load Per Upright Frame:
16000-22000 Kg
Pallet Size:
1000x1200mm / 1200x1000mm / 1200x1200mm Or Custom
Lane Depth:
5-20 Pallets Deep
Rail Length:
Up To 60m Per Lane
Levels:
2-6 Levels
Beam Section:
100x50mm / 120x50mm / 140x50mm
Upright Section:
90x70mm / 100x70mm / 120x90mm
Deflection Limit:
L/200 Standard, L/250 On Request
Working Temperature:
-30 C To +45 C
Documentation:
PDF Specification Sheet, Load Charts And Assembly Drawings
Surface Finish:
Powder Coating, Blue Uprights And Orange Beams
Packaging Details:
Flat packed steel bundles with edge protection and steel strapping, seaworthy export packing, wooden case for shuttle units
Supply Ability:
500 Sets per Month
Highlight:

Cold Warehouse Radio Shuttle Racking

,

1500kg Pallet Load Radio Shuttle Rack

,

High Density Radio Shuttle Storage Solution

Product Description
Radio Shuttle Racking System with 1500kg Pallet Load Capacity

This radio shuttle racking system is engineered around a single question that decides every shuttle project: what load has to be carried, and how deep? The standard configuration handles 1000-1500 kg per pallet on rails inside a deep storage lane, with heavier loads engineered on request. Every quote is issued with a load capacity table, beam and upright sections, and a lane layout drawing.

A full PDF specification sheet covering load charts, rail sections, shuttle dimensions and installation requirements is available on request.

Cold Warehouse Radio Shuttle Racking System 1500kg Pallet Load High Density Storage Solution

Cold Warehouse Radio Shuttle Racking System 1500kg Pallet Load High Density Storage Solution

Cold Warehouse Radio Shuttle Racking System 1500kg Pallet Load High Density Storage Solution

Cold Warehouse Radio Shuttle Racking System 1500kg Pallet Load High Density Storage Solution

Cold Warehouse Radio Shuttle Racking System 1500kg Pallet Load High Density Storage Solution

Racking System Load Capacity in Detail
Parameter Standard Heavy Duty Option
Load per pallet 1000 kg 1500-2000 kg
Load per level (2 pallets) 2000 kg 3000-4000 kg
Load per upright frame 16000 kg 22000 kg
Beam section 100x50mm 120x50mm / 140x50mm
Upright section 90x70mm 100x70mm / 120x90mm
Rail section Cold rolled rail Reinforced rail with welded gusset
Deflection limit L/200 L/250 on request

Load capacity is never quoted from a single generic figure: it changes with pallet size, number of levels, lane depth and the pallet support type. Our engineers confirm the final figure against your pallet drawing before production.

Pallet Racking Requirements We Work To
  • Pallet dimensions and condition: length, width, height, entry side and whether the pallet is wood, plastic or steel.
  • Unit load weight: average and maximum, plus the pallet tare weight.
  • Warehouse dimensions: clear height, column grid, floor levelness and floor load capacity.
  • Handling equipment: forklift model, lift height and required aisle width at the picking face.
  • Throughput and SKU profile: pallets in and out per shift, and how many SKUs share a lane.
  • Environment: ambient, chilled or freezer room, and any fire protection requirement.

Send these six items and we return a lane layout, a load capacity calculation and a quotation — normally within two working days.

How the Pallet Shuttle Works
  • The forklift sets the pallet on the shuttle at the face of the lane.
  • The radio shuttle carries it on rails to the first free position and returns automatically.
  • Retrieval reverses the process, commanded by handheld remote control.
  • One shuttle can serve several lanes on the same level, so investment stays proportional to throughput.
Quality Control and Documentation
  • Lane sample load tested before shipment, with the test record supplied.
  • Weld and dimensional inspection against the approved drawing.
  • Shuttle function test: forward, reverse, lift, lower, remote response and battery alarm.
  • Packing list, assembly drawings, shuttle manual and load capacity table shipped with every order.
  • Cold Warehouse Radio Shuttle Racking System 1500kg Pallet Load High Density Storage Solution

    Cold Warehouse Radio Shuttle Racking System 1500kg Pallet Load High Density Storage Solution

    Cold Warehouse Radio Shuttle Racking System 1500kg Pallet Load High Density Storage Solution

    Cold Warehouse Radio Shuttle Racking System 1500kg Pallet Load High Density Storage Solution

    Cold Warehouse Radio Shuttle Racking System 1500kg Pallet Load High Density Storage Solution

    Cold Warehouse Radio Shuttle Racking System 1500kg Pallet Load High Density Storage Solution

Delivery

Uprights, beams and rails are packed as flat bundles with edge protection and steel strapping for sea freight; shuttle units travel in wooden cases. Standard lead time is 20-30 working days after drawing approval, and we support site installation remotely.

Request the PDF specification sheet and a load capacity calculation for your project today.