| Brand Name: | Peterack |
| Model Number: | PT-GD3000 |
| MOQ: | 1 x 20GP Container (about 20 tons) |
| Price: | USD 0.95 - 1.35 / Kilogram |
| Payment Terms: | T/T,L/C at sight,Western Union |
| Supply Ability: | 2500 Tons per Month |
Steel grating deck pallet rack for warehouses that must combine heavy pallet loads with fire-safety compliance and wash-down hygiene.
This steel grating deck pallet rack solves a problem that beam-and-wire-mesh racking cannot: open steel grating lets sprinkler water pass straight through every level while still carrying point loads from drum pallets, block pallets and heavy machinery parts. Each level is rated 2,000-3,000 kg uniformly distributed, and the deck is welded from 3 mm bearing bars at 30 x 100 mm pitch, so the pallet does not sink between supports the way it does with thin mesh decking. The frame geometry is drawn to the real load case rather than to a catalogue size, which keeps uprights straight after years of forklift impact.
Key Features| Parameter | Specification |
|---|---|
| Model | PT-GD3000 |
| Load capacity per level | 2,000-3,000 kg (uniformly distributed) |
| Deck type | Welded steel grating, 30 x 100 mm pitch, 3 mm bearing bar |
| Standard bay width | 2,700 mm (2,300-3,600 mm available) |
| Standard depth | 1,100 mm (800-1,500 mm available) |
| Frame height | 3,000-9,000 mm in 50 mm steps |
| Upright section | W90 x D68 x 2.0 mm, W100 x D68 x 2.3 mm |
| Beam profile | Box beam 100 x 50 x 1.5 mm / 120 x 50 x 1.5 mm |
| Beam adjustment | 50 mm pitch, teardrop slot, safety pin included |
| Surface treatment | Hot dip galvanized per EN ISO 1461, powder coat optional |
| Colour option | Galvanized natural, RAL 5010 blue, RAL 2004 orange |
| Accessories | Row spacers, upright protectors, beam label holders, floor anchors |
![]()
![]()
![]()
The grating deck version is specified where pallets meet water, fire rules or heavy point loads: food and beverage plants that hose down the racking floor, chemical and paint stores holding 200 litre drums, cold-chain rooms where ice builds on the deck, and covered outdoor yards that store lumber, steel profiles and bagged material. It is also the usual answer for existing buildings where the fire engineer refuses solid steel or particle board decking because in-rack sprinkler coverage cannot be demonstrated.
Project Case StudiesUprights are wrapped in bubble film with cardboard corner protectors, beams are bundled with steel strapping, and grating panels are stacked on export plywood pallets and strapped in bundles of ten. Every order ships with a load drawing stamped against the actual upright and beam sections used, mill certificates for the steel coil, galvanized coating thickness readings and a packing list keyed to bay numbers so the installer can unload in sequence. A 24-month structural warranty applies to frames and beams under rated load, and spare uprights, beams and deck panels can be reordered by model number for the life of the installation.