| Brand Name: | Peterack |
| Model Number: | PT-CR01 |
| MOQ: | 20 Sets |
| Price: | USD 0.85-1.35 / Kilogram |
| Payment Terms: | T/T,L/C at sight,Trade Assurance |
| Supply Ability: | 3000 Sets per Month |
Structural steel cantilever racking is what you specify when the load is genuinely heavy and the profile is genuinely long. Where a light cantilever bay is built around folded sheet columns, this system uses structural steel uprights, 12 mm base plates and through bolted arm connections sized for the bending moment that a 6 m to 12 m bundle of pipe, channel or structural section actually generates at the column. The bay is drawn per project: column spacing follows the stock length, arm length follows the bundle width, and the height follows the reach of the side loader or crane that will service the rack. Because the module is bolt together, the same column family can be used for a single sided wall run in one bay and a free standing double sided island in the next, which keeps spares and future expansion simple.
![]()
![]()
![]()
![]()
| Parameter | Specification |
|---|---|
| Configuration | Single sided or double sided, modular bolt together |
| Column centre distance | 2000 mm to 4000 mm |
| Overall height | 4000 mm to 9000 mm |
| Arm length | 800 mm to 2000 mm |
| Load capacity | 1000 kg to 4000 kg per arm, load centre dependent |
| Material grade | Structural steel to Q235B or Q355B |
| Bolting | Grade 8.8 galvanized bolts, through bolted site assembly |
| Base plate | 12 mm plate with 4 anchor bolt holes per column |
| Surface finish | Hot dip galvanized 65 micron or RAL powder coating |
| Optional | Aisle guide rails, arm dividers, crane loading end stops |
This system suits steel service centres and stockholders handling structural sections, seamless pipe, rectangular hollow section and rebar bundles, plus heavy fabrication shops that need material staged close to the cutting and welding lines. It is also used for concrete precast elements, moulds and heavy tooling where an overhead crane rather than a forklift does the handling. Because the arms are rated at the real load centre and the columns are anchored through 12 mm base plates, the rack can be installed on a normal reinforced concrete slab without a bespoke foundation design in most yard and warehouse cases.
![]()
![]()
![]()
![]()
![]()
![]()
Bays are shipped knocked down in numbered bundles: upright frames, arm sets, bolting kits and anchor templates are packed by bay so that site crews can install without opening and sorting the whole container. Profiles are protected with EPE foam, banded with steel strapping and loaded onto fumigation free pallet bases for sea freight. Every project is produced against a signed approval drawing, weld quality is checked by in house inspection, and a galvanizing thickness report is provided with the shipping documents. We warrant the racking for 24 months against manufacturing defects and support customers with installation guidance, anchor layout drawings and load capacity signage after delivery.