logo
последний случай компании о
Подробности решений
Created with Pixso. Дом Created with Pixso. решения Created with Pixso.

Transforming a Global E-commerce Fulfillment Center with ASRS Rack -- PETERACK -86-133-9078-5739

Transforming a Global E-commerce Fulfillment Center with ASRS Rack -- PETERACK -86-133-9078-5739

2026-02-06

Transforming a Global E-commerce Fulfillment Center with ASRS Rack

Client: Velocity Commerce (a pseudonym for a leading global e-commerce retailer)
Industry: E-commerce & Logistics
Challenge: To address explosive sales growth, severe labor shortages, escalating land costs, and the need for next-day delivery promise in a major metropolitan hub.
Solution: Design and implementation of a high-density, fully automated ASRS (Automated Storage and Retrieval System) rack-supported warehouse.
Results: 300% increase in storage capacity, 500% improvement in peak order processing speed, 99.995% inventory accuracy, and 60% reduction in operational labor costs within the same building footprint.


1. Executive Summary

Facing unsustainable operational pressures, Velocity Commerce embarked on a transformational automation project at its flagship regional fulfillment center. By deploying a state-of-the-art ASRS rack system as the core of its new logistics infrastructure, the company not only solved its immediate capacity and labor crises but also established a scalable, precise, and highly efficient hub capable of supporting its growth for the next decade. This case study outlines the journey, the technology, and the profound business impact.

2. The Challenge: Growth Pains at Scale

Velocity Commerce’s existing manual warehouse, spanning 150,000 sq. ft., had hit critical limitations:

  • Space Exhaustion: Storage was completely full. Expanding the building footprint in the high-cost urban location was financially prohibitive.

  • Labor Intensity & Instability: The facility relied on over 200 forklift operators and pickers. High turnover, training burdens, and seasonal hiring spikes led to inconsistent productivity and rising costs.

  • Throughput Ceiling: During sales events like Black Friday, the manual system maxed out at 25,000 order lines per day, causing dangerous delays and missed delivery guarantees.

  • Accuracy & Traceability Issues: A 98.5% pick accuracy rate resulted in significant costly returns, mis-ships, and inventory discrepancies, damaging customer trust.

The business needed a paradigm shift—not just more space or people, but a fundamentally smarter way to store and handle goods.

3. The Solution: An ASRS Rack Ecosystem

Working with a premier systems integrator, Velocity Commerce implemented a tailored ASRS rack solution. The system was not merely racks but an integrated ecosystem:

A. Physical Infrastructure: The High-Density ASRS Rack Framework

  • Structure: 32-meter-high (105 ft) steel racking, utilizing the full clear height of the building. The design featured narrow aisles (only ~1.5m wide) for stacker cranes, creating ultra-dense storage for over 50,000 pallets and trays.

  • Configuration: A hybrid system with two zones:

    1. Pallet ASRS: For full-case storage of fast-moving items, with deep-lane configuration for high-volume SKUs.

    2. Mini-Load ASRS: For slower-moving and smaller items stored in standardized totes, enabling automated "goods-to-person" order picking.

  • Integration: The rack structure seamlessly interfaced with inbound/outbound conveyor networks, automated palletizers, and a fleet of AMRs (Autonomous Mobile Robots) for case movement to packing stations.

B. The "Nervous System": Automation & Software

  • Hardware: 12 high-speed stacker cranes (for pallets) and 8 mini-load retrievers operated 24/7 in the aisles. They are guided by ultra-precise laser positioning systems.

  • Control Brain: A robust Warehouse Control System (WCS) directly controls all automated equipment in real-time, optimizing travel paths and task sequences.

  • Management Intelligence: The WCS is seamlessly integrated with the company’s Warehouse Management System (WMS), which manages all inventory data, order prioritization, and business rules. Every single tote and pallet location is tracked in real-time.

4. Implementation & Go-Live

The project followed a phased approach over 14 months:

  1. Detailed Simulation: The entire system’s performance was modeled and stress-tested digitally before construction began.

  2. Parallel Build & Operation: A section of the old warehouse remained operational while the ASRS was constructed in stages, minimizing business disruption.

  3. Staged Commissioning: System testing began with individual components, then aisles, and finally full integration with the WMS/WCS.

  4. Training & Transition: A core team of technicians and operators was trained extensively, transitioning staff from manual laborers to system supervisors and problem-solvers.

5. The Results: Quantifiable Transformation

The impact of the ASRS rack system was dramatic and measurable:



Metric Before (Manual) After (ASRS) Improvement
Storage Capacity 150,000 sq. ft. at capacity Effective capacity of ~450,000 sq. ft. within same footprint 300% Increase
Peak Order Processing 25,000 order lines/day 125,000+ order lines/day 500% Increase
Inventory Accuracy ~98.5% 99.995% Near-Perfect Accuracy
Labor for Storage/Picking 200+ employees ~80 system supervisors & technicians 60% Reduction
Order Cycle Time 4-8 hours (pick to ship) Consistent under 1 hour 75%+ Faster
Energy Consumption High (diesel forklifts, lighting) Lower (electric stackers, zone lighting) 35% Reduction
Safety Incidents Moderate (forklift-related) Near Zero (man-machine separation) Dramatic Improvement

Additional Strategic Benefits:

  • Scalability: The rack structure and control system are designed for easy future expansion by adding more aisles vertically or laterally.

  • Uninterrupted Operations: The system operates reliably in three shifts, unaffected by shift changes, breaks, or labor shortages.

  • Enhanced Data Capital: The real-time, granular inventory data enables better demand forecasting, purchasing, and supply chain planning.

6. Conclusion & Strategic Outlook

For Velocity Commerce, investing in an ASRS rack system was not an expense but a strategic capital investment in its operational DNA. The system successfully turned its greatest constraints—space, labor, and accuracy—into core competitive advantages.

The warehouse is no longer a cost center but a high-performance, predictable, and reliable engine for customer satisfaction. This case demonstrates that for large-scale, high-velocity operations in competitive markets, ASRS rack technology provides the definitive answer to achieving and sustaining market leadership. Velocity Commerce is now poised to replicate this model in other global hubs, using data from this flagship center to refine and optimize future deployments.