Our client, a major Australian frozen food manufacturer specializing in frozen french fries, required a high-density cold storage solution for their new distribution center. Operating at extreme freezer temperatures between -25°C and -35°C, the facility needed to accommodate 10,000 pallet positions with standard 1m x 1m x 1m pallets carrying 800kg of frozen product each. The company sought to maximize storage density while maintaining efficient FIFO inventory rotation for their frozen food products.
![]()
![]()
![]()
![]()
The client faced several critical challenges in their cold storage operations:
We designed and delivered a comprehensive Radio Shuttle Rack System tailored specifically for the client's frozen food cold storage requirements. The solution included:
The project was executed in three phases to align with the client's production schedule:
| Phase | Scope | Timeline |
|---|---|---|
| Phase 1 | Engineering design, 3D layout simulation, and structural calculations for AS 4084 compliance | 4 weeks |
| Phase 2 | Manufacturing, quality inspection, and sea freight to Australian port | 8 weeks |
| Phase 3 | On-site installation, shuttle commissioning, operator training, and final handover | 6 weeks |
The Radio Shuttle Rack system delivered outstanding results for the client's frozen food distribution operations:
| Metric | Before | After | Improvement |
|---|---|---|---|
| Storage Density | Baseline (Selective Racking) | 10,000 pallet positions in same footprint | +80% |
| Forklift Travel Distance | Full lane entry per pallet | Entrance drop-off only | -70% |
| Freezer Door Open Time | Extended per operation | Rapid pallet exchange | -60% |
| Energy Consumption | Baseline refrigeration load | Reduced heat ingress | -25% |
| Inventory Accuracy | Manual tracking | Shuttle position logging | +99% |
The client's operations director commented: "The radio shuttle rack system has transformed our frozen storage operations. We achieved significantly more storage capacity within our existing freezer building, and our energy costs have dropped noticeably. The shuttle carts perform reliably even at minus 35 degrees, which was our primary concern. The installation team was professional and completed the project on schedule."
This project demonstrates the effectiveness of Radio Shuttle Rack systems for large-scale frozen food cold storage applications. By combining deep lane high-density racking with cold storage grade automation technology, food companies can dramatically improve warehouse space utilization while reducing operational costs. Our turnkey project delivery including design, manufacturing, shipping, installation, and commissioning ensured a seamless experience for the Australian client, with full compliance to AS 4084 standards.